Foundation Structures Scope:

 

  • Install 72ea caissons, up to 84” in diameter
  • Furnish and install complex shear wall rebar packages
  • Furnish and install reinforcing steel and concrete
  • Included over 650 vertical feet of 84” drilling
  • Included over 650 vertical feet of 60” drilling
  • Percussion drilling completed

 

Request a Bid