Foundation Structures Scope:

  • Furnish and install reinforcing steel and concrete
  • Install drilled shafts of 48” diameter
  • Install drilled shafts of 54” diameter
  • Install drilled shafts of 60” diameter

Challenges Recognized:

  • FSI supplied and installed temporary casing as seen required to eliminate potential issues

 

Request a Bid