Challenges Recognized:

  • Drilled shafts located immediately adjacent to existing tracks and concrete wall
  • Very rocky and fractured drilling conditions

Foundation Structures Scope:

  • Install 24” diameter shafts for new soldier pile retaining wall
  • Completed with no impact to nearby rail traffic or commuter traffic

 

Request a Bid