Obstacles to Overcome:
- Very low overhead clearance from existing wires
- Restricted work space behind existing guard rail
- Close proximity to existing utility poles
FSI Scope & Methodology:
- Utilize LoDril attachment
- Install 24” diameter drilled shafts
- Install 36” diameter drilled shafts
- New soldier pile retaining wall