Obstacles to Overcome:

  • Very low overhead clearance from existing wires
  • Restricted work space behind existing guard rail
  • Close proximity to existing utility poles

FSI Scope & Methodology:

  • Utilize LoDril attachment
  • Install 24” diameter drilled shafts
  • Install 36” diameter drilled shafts
  • New soldier pile retaining wall
Request a Bid