Obstacles to Overcome:
- Very restricted work space while working around SEPTA repair crews
- Very low overhead clearance from existing wires
- Existing rail lines immediately adjacent
Methodology:
- Utilized specialty equipment with LoDril attachment due to low overhead
- Completed with no damage to existing SEPTA utilities or surrounding areas
- Construction of 42” and 36” catenary foundations
- Construction of 36” downguy foundations