Obstacles to Overcome:

  • Very restricted work space while working around SEPTA repair crews
  • Very low overhead clearance from existing wires
  • Existing rail lines immediately adjacent

Methodology:

  • Utilized specialty equipment with LoDril attachment due to low overhead
  • Completed with no damage to existing SEPTA utilities or surrounding areas
  • Construction of 42” and 36” catenary foundations
  • Construction of 36” downguy foundations