Challenges Recognized:

  • Working immediately adjacent to and underneath existing high voltage electric lines
  •  FSI supplied and installed temporary casing as seen required to eliminate potential issues

Scope of Work Included:

  • Drilled shafts of 30” and 36” diameter
  • Furnish and install permanent steel casing pipe
  • Furnish and install rebar cages and anchor bolt packages
  • Close coordination with client schedule and access areas

 