Challenges Recognized:
- Working immediately adjacent to and underneath existing high voltage electric lines
- FSI supplied and installed temporary casing as seen required to eliminate potential issues
Scope of Work Included:
- Drilled shafts of 30” and 36” diameter
- Furnish and install permanent steel casing pipe
- Furnish and install rebar cages and anchor bolt packages
- Close coordination with client schedule and access areas