Challenges Recognized:
- Working immediately adjacent to existing overhead wires
- Tight working space
- Obstruction drilling required
Foundation Structures Scope:
- Furnish and install permanent steel casing pipe
- Furnish and install rebar cages
- Perform concrete placement
- Over 500 vertical feet of 30” soil drilling
- Over 200 vertical feet of 30” rock sockets
Request a Bid