Challenges Recognized:

  • Working immediately adjacent to existing overhead wires
  • Tight working space
  • Obstruction drilling required

Foundation Structures Scope:

  • Furnish and install permanent steel casing pipe
  • Furnish and install rebar cages
  • Perform concrete placement
  • Over 500 vertical feet of 30” soil drilling
  • Over 200 vertical feet of 30” rock sockets

 

Request a Bid