Foundation Structures Scope:
- 3 caissons at 72” diameter
- Construction of concrete grade beams
- Construction of hammerhead pier cap with 72”
diameter columns
Challenges Recognized:
- One caisson located immediately over existing
underground electrical duct bank
Solution: FSI proposed alternate locations and drilling
techniques to install elements as required - Work area immediately adjacent to active pedestrian and
vehicular traffic
The project was completed on time, safely, and with no
impacts to surrounding traffic!