Foundation Structures Scope:

  • 3 caissons at 72” diameter
  • Construction of concrete grade beams
  • Construction of hammerhead pier cap with 72”
    diameter columns

 

Challenges Recognized:

  • One caisson located immediately over existing
    underground electrical duct bank
    Solution: FSI proposed alternate locations and drilling
    techniques to install elements as required
  • Work area immediately adjacent to active pedestrian and
    vehicular traffic
    The project was completed on time, safely, and with no
    impacts to surrounding traffic!

 